SMED Changeover Analysis Workbook
Record a changeover step by step, separate internal and external work, quantify the reduction potential and prove the result. A practical SMED study for one changeover.
CI Project Portfolio & Savings Tracker
One register for all improvement projects of a site: pipeline by stage, planned versus realised savings by month, finance validation and overdue projects in one portfolio view. A portfolio tracker for the continuous improvement projects of one site and one fiscal year.
€14.90
Not tested on Mac, Excel for the web or Google Sheets.
You choose the workbook language on the download page after payment.
A portfolio tracker for the continuous improvement projects of one site and one fiscal year. Every project is entered once in PROJECTS (method, area, stage, savings type, planned annual savings, cost, savings start). Realised savings are entered per month in SAVINGS after month close. PORTFOLIO shows the pipeline by stage, planned versus realised savings by savings type, method and area, the finance-validated share, overdue projects and the cumulative hard savings against the annual target.
1 Excel workbook (KW-CIM-001-EN-GEN-KIT_CI-Project-Portfolio-Savings-Tracker_v1.0.1.xlsx, English) and 3 text files (LICENSE_EN.txt, CHANGELOG_EN.txt, SUPPORT_EN.txt) in one folder.
KW-CIM-001-EN-GEN-KIT_CI-Project-Portfolio-Savings-Tracker_v1.0.1.xlsxLICENSE_EN.txtCHANGELOG_EN.txtSUPPORT_EN.txtTarget environment: Microsoft Excel Desktop on Windows. Tested on Microsoft 365 on Windows 11. No macros, no internet connection. Sheets are protected without a password (Review > Unprotect Sheet). Capacity: 100 projects, 12 areas, one fiscal year.
Not tested on Mac, Excel for the web or Google Sheets.
Digital download (ZIP). No physical item is shipped.
One site, internal use; unlimited users at that site; no redistribution or resale.
For support, please use the messaging function of the shop where you purchased this product.
Typical situations
Use it wherever improvement projects need one shared list instead of scattered spreadsheets – from the first idea to confirmed savings.
Walk through the pipeline by stage, see which projects are overdue and decide what moves forward.
Compare planned and realised savings by month, savings type, method and area. Hard savings stay separate from cost avoidance.
Mark which projects controlling has confirmed, so the reported numbers can be defended.
Follow progress against the yearly hard-savings target and see the gap early enough to act.

Record a changeover step by step, separate internal and external work, quantify the reduction potential and prove the result. A practical SMED study for one changeover.
Calculate takt from demand, list the work elements, compare the current station split with a rebalanced proposal and see the effect on operators, output and balance loss. A line balancing tool for one manual or semi-automatic line.
Root Cause, Corrective Action & Effectiveness System for Manufacturing. It guides you through a structured 8D problem-solving case: from a factual problem definition and containment, through data, possible causes and evidence, to a verified root cause, corrective actions, an effectiveness check and a printable 8D report.