SMED Changeover Analysis Workbook
Record a changeover step by step, separate internal and external work, quantify the reduction potential and prove the result. A practical SMED study for one changeover.
Line Balancing & Yamazumi Workbook
Calculate takt from demand, list the work elements, compare the current station split with a rebalanced proposal and see the effect on operators, output and balance loss. A line balancing tool for one manual or semi-automatic line.
€14.90
Not tested on Mac, Excel for the web or Google Sheets.
You choose the workbook language on the download page after payment.
A line balancing tool for one manual or semi-automatic line. Enter demand and available time once; the workbook calculates takt and planned cycle time. List the work elements with their time, value type and precedence, assign them to stations for the current state and for a proposal, and the BALANCE sheet shows the Yamazumi charts against takt, the bottleneck, output, capacity, balance efficiency and the minimum number of stations.
1 Excel workbook (KW-LEA-001-EN-GEN-KIT_Line-Balancing-Yamazumi-Workbook_v1.0.1.xlsx, English) and 3 text files (LICENSE_EN.txt, CHANGELOG_EN.txt, SUPPORT_EN.txt) in one folder.
KW-LEA-001-EN-GEN-KIT_Line-Balancing-Yamazumi-Workbook_v1.0.1.xlsxLICENSE_EN.txtCHANGELOG_EN.txtSUPPORT_EN.txtTarget environment: Microsoft Excel Desktop on Windows. No macros, no internet connection. Sheets are protected without a password (Review > Unprotect Sheet). Capacity: 100 work elements, 12 stations.
Not tested on Mac, Excel for the web or Google Sheets.
Digital download (ZIP). No physical item is shipped.
One site, internal use; unlimited users at that site; no redistribution or resale.
For support, please use the messaging function of the shop where you purchased this product.
Typical situations
Use it when a manual or semi-automatic line has to be set up, rebalanced or checked against customer demand.
Turn demand and available time into takt and planned cycle time.
Stack the work elements per station against takt and see the bottleneck at a glance.
Compare the current split with a proposal and see the effect on operators, output and balance loss.
Re-run the numbers when demand, product mix or shifts change.

Record a changeover step by step, separate internal and external work, quantify the reduction potential and prove the result. A practical SMED study for one changeover.
One register for all improvement projects of a site: pipeline by stage, planned versus realised savings by month, finance validation and overdue projects in one portfolio view. A portfolio tracker for the continuous improvement projects of one site and one fiscal year.
Root Cause, Corrective Action & Effectiveness System for Manufacturing. It guides you through a structured 8D problem-solving case: from a factual problem definition and containment, through data, possible causes and evidence, to a verified root cause, corrective actions, an effectiveness check and a printable 8D report.